SIX SIGMA PROJECTS

  • RAIL CAR CYCLE TIME
  • CHEMICAL PLANT BOTTLENECK
  • RETAIL DISPLAY
  • WATER TREATING
  • POWER DISTRIBUTION RELIABILITY
  • REDUNDANT ANALYSIS
  • NEW CAPACITY JUSTIFIED
  • PEOPLE SELECTION
  • PARTS FAILING AFTER FINAL MACHINES
  • OUT OF SPECIFICATION PRODUCT
  • ENGINEERING CHANGES
  • WEB DESIGN

 

project

POWER ENGINEERING & CONSULTANCY PROJECTS

  • Design Criteria
  • Electrical Power System Study and analysis
  • Switch yard Plan & Section layout
  • Switch yards Single line diagrams
  • Switch yard erection key diagram – Plan & Section layouts
  • Switch yard structure layouts
  • Switch yard Clearance Check Diagram
  • Switch yard illumination layout
  • Switch yard DSLP calculation & DSLP layouts
  • Earthmat design & layout

 

  • Switch yard foundation layouts (as per Civil Inputs)
  • Switch yard cable trench layouts & its Sections
  • Power & Control Cable Schedule & Cable Sizing
  • Single line diagram of ACDB, DCDB etc
  • Al tube cutting schedules
  • LV System Design and Power flow Diagram
  • LT/HT Panel Drawing Reviews
  • ACSR & AL tube estimations
  • Clamps & connectors quantity estimation
  • String hardware selection & estimation

 

  • Cable trench designing & estimation
  • Cable Schedule
  • Shield wire estimation
  • Earthmat & risers calculation
  • Panel arrangement in control room
  • Motor Sizing Calculation
  • Transformer Sizing Calculation
  • Battery and Charger Sizing Calculation
  • Relay Setting Calculation
  • All Vendors Drawings Review

THE NEXT LEVEL OF YOUR SUCCESS